![]() General: JBLM Primary power distribution is a 13,800-volt, 3-phase, 3-wire single-point grounded wye system. JBLM has adopted Tacoma Public Utilities (TPU) utility design criteria and construction standards for all power distribution work performed on the Installation. All new construction installation, remodel, and retrofit work requires inspection and acceptance by the Joint Base Lewis - McChord Department of Public Works.Ĭ. All designs shall be reviewed and approved by the Joint Base Lewis - McChord Department of Public Works. The governing primary code document is UFC 3-550-01 the secondary governing code document is NFPA 70 and IEEE C2.ī. 33 71 02 Underground Electrical DistributionĬhanges or Criteria Notes to Unified Facilities Guide Specifications (UFGS) Paragraph # and Title (if any)įor areas not included in the above electrical utility privatization, the below design requirements still apply.Ī.ASA IE&E Sustainable Design and Development Policy (Jan 17 2017).UFC 1-200-2 (High Performance and Sustainable Buildings Requirements). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |